Sahara has been working with Pembina on 12 miles of pipe required for their Red Water Plant expansion. Various diameter pipes were SCAT tested, solvent cleaned SSPC-SP1 and sandblasted to SP6-commercial blast specifications. Pipes were then loaded into our shops to be coated with Interguard 345 Epoxy and Interthane 990.
- 780-466-2187
- info@saharasandblasting.com
Menu